Branch Conduit installation (1/2 to 1 1/4 conduit)
1 (Low)
2
3
4
5 (High)
Offsets, kicks, saddles, 90's
GRC/IMC, EMT, PVC
Junction box usage and sizing
Conduit Bodies
Hanger spacing and installation
Color Coding
Branch cable installation
MC/AC cable installation
Hanger spacing and installation
Branch wire installation (#16 - #08)
Color Codes
Wire nut sizing & installation
Kernies
Spade Lugs and Butt Splices
Device trim out
Duplex receptacles
GFI Receptacle installation
IG Receptacles
Switches (1p, 3way, 4way)
Cord caps
Underground branch installation
PVC Conduit installation
GRC/IMC - Wrapping conduit
U/G J-box installation
Light fixture installation
Lay in ceiling
Sheetrock ceiling
Surface mounting
Fixture supports
Pole Lighting
Light pole bases
Fusing (electric code)
Bollard lighting
Grounding/Bonding
Building grounds
Transformer Grounding
Isolated Grounding Systems
Switchboards/Motor Control Centers
Rigging and Hoisting
Set up and supports
Bus torque
Clearances, doors, etc (Code)
GFI installation
Meter installation (Amp, Voltage, etc)
Panel boards
Mounting
Ground bars
Isolated ground bars
Delta panels
1Ph/3Ph panels
Feeder terminations
Branch terminations
C/B sizing
Transformer installation
Buck Boost Transformers
Step down & step up transformers
Transformer bonding
Mounting
Ceiling/Wall/Floor
Clearances (Code)
Disconnects
Where required (Service, Motors, etc)
Application (Fused, Non Fused, N1, N3R, etc)
Fuse sizing & types
Fuse clips
Feeder conduit installation ( 1 1/2" to 4" conduit)
Conduit routing and layout
Panel & J-Box penetrations
J-Box sizing & types (N1, N3, N4, etc)
Wireways & Gutters
Feeder Racks (vertical & horizontal)
Bending
Underground installation (Burial Depth, Chairs)
Feeder wire installation (#08-750MCM)
Making up a "head"
Wire reel set-up and pulling techniques
Kernies/Compression terminations and splices
Cable supports on vertical runs
Color Coding
Motor controls & Lighting controls
Start/Stop Station
Jog buttons
Hand/Off/Auto Switches
Photo cell
Time Clock
Lighting Contractors
Split bus panels
Motor starters
Sizing of motor starters
Sizing of heaters
Auxiliary Contacts
Motor terminations
120V,208V/1Ph,208V/3Ph,480V/3Ph
0 to 100 Hp
Disconnect requirements
Electric Services
Primary/secondary duct bank
Temporary Meter Loop
Multi-tenant service w/house service
Single tenant service
Different Utility Requirements
Blueprint reading
Blueprints
Addendum
Specifications
Change Orders
Lay out of walls
National Electric Code
Sizing Conduit
Sizing Wire
Clearances
Tools
Hammer Drill
Rotor Hammer
Hydraulic Benders
(Sidewinder, Single Shot/Mult-Shot Benders)
Compression Tools
Motorized Scaffolds
Hydraulic Cable Cutters
Wire Tuggers
Core Drill
Vacuum/Birds
Meters
("Wiggy", Amp-Probe, Volt/Ohm Meter, Megge)
Optional Section
Explosion proof basic installation
Seal offs
Boxes
Motor connections
Bus Duct
Supports
Plug In bus - vs. - feeder bus
Torque techniques